The roof is on. Still to be done
are the flashings and the gutters, but it looks terrific. Also achieved this
week was some more internal framing and more blocking out.
Twenty five truckloads of gravel (!)
arrived this week two to be laid on the new driveway. The builders are loving this, because with all
the little bits of rain we have been having lately, daily arrival on site was a
bit of a cross country climb. Now they can drive straight up the house site
without fear of being bogged!
No comments:
Post a Comment